Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /homepages/42/d92353444/htdocs/wp-includes/functions.php on line 6121
Rhein-Ruhr-Zentrum Mülheim – Concepta
de
Navigation öffnen

Rhein-Ruhr-Zentrum Mülheim


Rhein-Ruhr-Zentrum in Mülheim on the grounds of the former Humboldt mine is a good example of the successful reuse of space as well as of ongoing conceptional refurbishment over the years. When opened in 1973, this was one of the first covered shopping centres and therefore set new benchmarks in Germany’s shopping centre scene. To this day, Rhein-Ruhr-Zentrum remains one of the ten largest shopping centres in Germany.

A joint venture refurbishment project with the involvement of a CONCEPTA managing partner and the architect Walter Brune. 






Facts & Figures


Opening date: 1973
Retail space: 120.000 m²
Shops: 200
Parking spaces: 5.000
Multiplex cinema: 3,200 seats in 11 theatres




More Projects